DIY estimate: How long do you think it will take to do the following work (assuming I have a lift)..
#1
AudiWorld Super User
Thread Starter
Join Date: Feb 2004
Posts: 3,994
Likes: 0
Received 0 Likes
on
0 Posts
![Default](https://www.audiworld.com/forums/images/icons/icon1.gif)
1. Replace passenger side horn (need to remove wheel liner)
2. Wire in a switch to my air horn (failed inspection)
3. Replace my suspension with the Vogt GT kit from the GB
4. Replace all 4 lower control arms
5. Change oil and filter
If I started at 7:00 PM, think I can get it done by midnight?
2. Wire in a switch to my air horn (failed inspection)
3. Replace my suspension with the Vogt GT kit from the GB
4. Replace all 4 lower control arms
5. Change oil and filter
If I started at 7:00 PM, think I can get it done by midnight?
#2
![Default](https://www.audiworld.com/forums/images/icons/icon1.gif)
oil change.....30 mins tops
Control arms....2 hrs???? (estimate)
as for the rest, i haven't a clue....
Control arms....2 hrs???? (estimate)
as for the rest, i haven't a clue....
#3
![Default](https://www.audiworld.com/forums/images/icons/icon1.gif)
taking me days. I ruined the upper control arms torching the pinch bolt and ruined a steering knuckle drilling out the pinch bolt on one side. The planned "two day" installed has lasted a lot longer in wait time for new parts to get here.
#5
![Default](https://www.audiworld.com/forums/images/icons/icon1.gif)
way I could accomplish all that solo in that timeframe. Have you done all these things before? For me, the first time takes a while and then if I have to do it again, it goes quick and smoothly.
Trending Topics
#8
![Default](https://www.audiworld.com/forums/images/icons/icon1.gif)
b/c of that goddamn pinch bolt!!! that is the main reason i didn't want to tackle it!! My advice, spray that **** w/ as much anit-seize as humanly possible!!! GL